Space shortage at Dutch meat substitute producer
Dapp conducted a layout study for a producer of meat substitutes. Due to the enormous growth that the client experiences year after year, a lack of space had arisen in a short space of time. Because building plans were already on the agenda, it was not an option to carry out an interim (small) renovation. This forced us to look for a quick and efficient solution within the current factory walls to solve the emerging bottlenecks. Using data analysis and simulation, we were not only able to provide new insights, but also to discover a previously undiscovered bottleneck. Our solution was realized within a few days and took a lot of pressure off the lack of space in the factory.